The FYFFE Avenue Grade Separation project, contracted by O.C Jones & Sons, Inc., comprises approximately 25 acres and is located at the Port of Stockton in Stockton, CA. The project site is located southwest of Interstate 5 and just West of the San Joaquin River.


This project will construct a new roadway along West Fyffe Avenue as well as a 115-foot long bridge to span Navy Drive and the shared Union Pacific Railroad, BNSF Railways, and Central California Traction Company tracks. This provides a direct connection to the port of Stockton West Complex.

The project will be constructed in two phases. Phase 1 of the project will construct 1,500 feet of a temporary detour road, realign and reconstruct 2,000 feet of the Golf Course Road, and will place 170,000 cubic yards of embankment fill.


During Phase 2, the bridge that will span Navy Drive and the Railroad tracks will be constructed using pre-cast I girders. Phase 2 also includes the construction of 2,000 linear feet of West Fyffe Avenue. The ultimate roadway will accommodate four-lanes of traffic; two 12-foot lanes in both directions with a two-foot wide raised median separating traffic.

Tully Consulting Group prepared the SWPPP and is providing SWPPP Inspections. We are happy to be a part of this project as it's just a few feet away from the Navy Drive Bridge Replacement project that we completed a few years back with Dillon & Murphy!


Need a SWPPP or SWPPP Inspections? Call (707) 693-1926 or email estimating@tullygroup.com for a proposal