Tully Consulting is a managed by principal, Robin Tully, PE, a California registered Professional Civil Engineer.  Ms. Tully has nine years of engineering experience and has handled projects from planning through to design and construction.  Her role in projects has ranged from Project Engineer to Project and Construction Manager.  Graduating from HumboldtStateUniversity in Arcata, CA with a Bachelor of Science in Environmental Resource Engineering, she is familiar with sustainable site design and water, sewer and stormwater treatment and modeling.

  

  

EDUCATION

CaliforniaStateUniversity, Humboldt, Arcata, CA

BS., Environmental Resources Engineering (ABET Accredited)

GPA: 3.67 (last 2 years)

                                                    Relevant Coursework: Fluid Dynamics, Water Quality, Open Channel Hydraulics,                                                     Hydrology, Soils Analysis and other core Civil Engineering coursework.

  

COMPUTER SKILLS

CAD Software: AutoCAD/Autodesk, Land Development Desktop

Hydrology Software: HEC-HMS (HEC-1), HEC-RAS (HEC-2), Culvert Master, Flow Master, Storm2000

Additional Software: Microsoft Schedule, Power Point, Access, Excel, Word, Adobe Photoshop

Programming Languages: Fortran 77, Fortran 90

  

CERTIFICATIONS

Professional Civil Engineer No. C64354, State of California

  

PROJECT PORTFOLIO

  

Civil Engineering Experience

 

FairfieldHigh School Paving Project 2005, Fairfield, CA: Project Engineer for the

preparation of construction documents for an asphalt rehabilitation of the student and staff

parking areas. Construction budget $300,000.

  

Anna Kyle Elementary Asphalt Extension 2006, Fairfield, CA: Project Engineer for the

preparation of construction documents for a new asphalt play area. Construction budget

$100,000.

  

Boggs Tract Sanitary Sewer Collection System, San Joaquin County, CA: Project

Engineer for the design of a new sanitary sewer system for the Boggs Tract development in

Stockton. The project involved three miles of 8" sewer pipeline to service 300 homes.

  

CapertonCanal, Placer County, CA: Project Engineer for the design of a raw water pipe

system through the new Bickford Ranch development. The pipeline will tie into an existing

canal and convey water through two miles of mainline (22" to 36" in diameter) and three

miles of lateral pipeline to provide irrigation water to both existing and new customers.

  

ColeCreek Dredging, ClearLakeState Park, Town of Kelseyville, CA: Assisted in the

preparation of construction documents for a small dredging project on ClearLake.

  

Drainage Master Plan, WillRogersState Historic Park, State Department of Parks and

Recreation, City of Los Angeles, CA: Project Engineer for the preparation of a stormwater

management plan for a 187-acre historical park in the Santa Monica mountains. The goals of

the project were to improve runoff water quality, reduce the risk of hillside erosion, and

prevent flooding around the historical structures.

  

Drainage and Floodplain Study, La Purisima State Historic Park, State Department of

Parks and Recreation, Town of Lompoc, CA: Project Engineer for the preparation of a

stormwater floodplain analysis for a 1,900-acre historical park along the CentralCoast. The

analysis involved preparing a hydrologic and hydraulic model of the local creek and a

preliminary design of a flood detention pond.

  

Drainage Infrastructure Improvements, FortBakerNational Park, Golden Gate National

Recreation Area, Marin County, CA: Assistant Engineer responsible for providing

construction plans for drainage upgrades within the 350-acre FortBaker historical site. The

work also involved providing the Park staff with recommendations on how to incorporate

sustainable stormwater designs into future Park developments.

  

Highway 1 Storm Drain Improvements and Noyo Bridge Widening, Fort Bragg, CA:

Assisted in the design of storm drainage for a $9 million Caltrans’ highway rehabilitation and

bridge project.

  

Highway 101 Storm Drain Improvements, Eureka, CA: Assisted in the design of storm

drain facilities for a $4 million Caltrans’ highway rehabilitation project through a four-mile

section of highway passing through the downtown area of Eureka.

  

Highway 101 Stabilization Trench and Fill Design, Willits, CA: Aided in the design of

stabilization trenches and a 30’ high polystyrene block fill embankment for a $9 million

Caltrans’ highway realignment along the Ridgewood grade section of Highway 101.

  

Ocean Colony Lift Station Study, City of Half Moon Bay, CA: Project Engineer for the study

of a 1200 gpm sewer lift station in Half Moon Bay. The goal of the study was to evaluate the

performance of the lift station and make recommendations for it’s proper performance.

  

Pelican Point Lift Station Rehab, City of Half Moon Bay, CA: Project Engineer for the

rehabilitation of a small sewer lift station for the City of Half Moon Bay. This project involved

the design of a new sewer wet well, new submersible pumps, new electrical controls, and a

new SCADA system.

  

Phase 2 Trenchless Sewer Rehabilitation, City of Half Moon Bay, CA: Construction

Manager and Project Engineer for the rehabilitation of over 9,500 LF of sewer pipe within the

City of HalfMoonBay. The project involved a competitive bid strategy between several

different trenchless rehab methods including Cured-in-Place Pipe, Fold and Form Pipe,

Pipebursting, Pipereaming, Spiral Wound PVC and and Deformed/Reformed Liner.

  

Sewer Lift Station, Butte-GlennCommunity College Police Safety Training Grounds, Butte

County, CA: Assisted in the design of a small sanitary sewer lift station for a police training

facility.

  

Stormwater Consulting, City of Half Moon Bay, CA: Assistant Engineer for the development

of a new stormwater management for the environmentally sensitive City. The work included a

full array of stormwater modeling, NPDES consulting and design services; preparation of a

hydrology model of the entire City, 100-year flood plain models of the two major creeks,

development of a stormwater Capitol Improvement Plan (CIP) for flood control and water

quality protection, drafting of new Design and Improvement Standards for stormwater Best

Management Practices (BMPs), and formulation of a model stormwater monitoring program.

  

Stormwater Detention System, Town of Mammoth Lakes, CA: Assisted in the preparation

of construction documents for an underground pipe detention system for the Bluffs project.

  

Stormwater Management Program, Contra Costa County, CA: Assisted in the development

of a stormwater management system for an 175-acre industrial facility. The project involved

designing a runoff management and treatment system to reduce sediment loads getting into

the CarquinezStrait to keep the client in compliance with an NPDES permit from the San

Francisco Regional Water Quality Control Board.

  

Stormwater Master Plan, Colusa Casino and Rancheria, Colusa, CA: Assisted in the

preparation of a Stormwater Master Plan for a 240-acre Native American Indian reservation.

Created a hydrology model of the contributing watersheds using HEC-HMS and analyzed

alternatives for addressing flood control needs and water quality protection using low impact

site design and stormwater BMP features.

  

Utilities Master Plan, Folsom Lake State Recreational Area, CA: Assistant Engineer for

recommendations for future utility upgrades within the Folsom State Recreational Area in

response to the State Parks’ new General Plan.

  

Waterline and Booster Pump Rehab, HawaiiVolcanoesNational Park, National Park

Service, Hawaii: Assistant Engineer for the design of a small water transmission line and

booster pump station in HawaiiVolcanoesNational Park.

  

2005 Folsom CustodyCenter Relocatables, Folsom, CA for Prison Industry Authority.

Project Engineer for the preparation of construction documents for grading and drainage

plans for the addition of relocatable classrooms to a prison facility.

  

2005 DeerCreekMaintenanceBuilding, El Dorado Hills, CA for El Dorado Irrigation

District. Project Engineer for the preparation of construction documents for grading and

drainage plans for a new maintenance building with heavy equipment loadings.

  

2006 D.W. Nelson Youth Correctional FacilityHigh School Modular Classrooms,

Stockton, CA for Prison Industry Authority. Project Engineer for the preparation of

construction documents for grading and drainage plans for new modular classrooms in a

California prison facility.

  

2006 Preston Youth Correctional FacilityHigh School Modular Classrooms, Ione, CA

for Prison Industry Authority. Project Engineer for the preparation of construction documents

for grading and drainage plans for new modular classrooms in a California prison facility.

  

2006 Southern Youth Correctional ReceptionCenterHigh School Modular Classrooms,

Norwalk, CA for Prison Industry Authority. Project Engineer for the preparation of

construction documents for grading and drainage plans for modular classrooms in a

California prison facility.

  

2006 O.H. Close Youth Correctional FacilityHigh School Modular Classrooms,

Stockton, CA for Prison Industry Authority. Project Engineer for the preparation of

construction documents for grading and drainage plans for modular classrooms in a

California prison facility.

  

2007 Soledad Dairy Inmate Changing Facility, Correctional Training Facility, Soledad, CA

for Prison Industry Authority. Project Engineer for the preparation of construction documents

for grading and drainage plans for modular classrooms in a California prison facility.

  

2007 New Administrative Office in Folsom, CA for Prison Industry Authority. Project

Engineer for preparation of construction documents for a retaining wall and grading and

drainage for a new administrative office with a focus on green building.

  

2006 Valhalla YMCA Daycare Facility. Project Engineer for the preparation of construction

documents for grading and drainage plans for the addition of a modular classroom at an

existing elementary school.

  

2007 Jefferson Commercial Development in West Sacramento, CA. Project Engineer for

the preparation of construction documents for grading, drainage, paving, public street

improvements and water, sewer and fire site utilities for a five acre commercial retail center.

  

2006 Camino Oruga Warehouses in Napa, CA. Project Engineer for the preparation of

construction documents for grading, drainage, paving and water, sewer and fire site utilities

for three storage warehouses on a three acre light industrial site in Napa, CA.

  

2007 Corning Light Industrial Shops in Corning, CA. Project Engineer for the preparation

of construction documents for grading, drainage and water and sewer infrastructure for new

light industrial shops on a three acre site.

  

2007 Rick’s Auto Spa in SuisunCity, CA. Project Engineer for the preparation of

construction documents for grading, drainage, paving and water and sewer utilities for a one

acre site with a recycled water car wash and retail facilty.

  

2007 Ramtown Karate North Adams Facility in Dixon, CA. Project Engineer for the

preparation of construction documents for grading, drainage and paving for a new karate

studio.

  

2006 Cogeneration Equipment for Two Healthclubs in San Ramon and Lafayette, CA.

Project Engineer for the preparation of construction documents for grading, drainage and

hardscape improvements for a cogeneration equipment retrofit project.

  

Project Management Experience

  

Grange Middle School 2005 Addition and Modernization, Fairfield, CA: Project Manager

for the planning, design and construction of the completion of the campus. New construction

included the addition of an 11,400 sf steel framed gymanisum, a 4 classroom addition, a new

administration building, track, football field, 2 softball fields, and various parking lot and

landscaping rehabilitation. Project budget approximately $8 million.

  

Sullivan Middle School 2005 Modernization, Fairfield, CA: Project Manager for the

planning, design and construction of a second modernization at the middle school.

Construction budget $750,000.

  

Fairfield and Armijo High Schools 2005 Stadium Track and Field Improvements,

Fairfield, CA: Project Manager for the planning, design and construction of track and field

improvements in two high school stadiums. The project was to replace the football fields with

synthetic turf fields. The work also involved a new rubberized track, stadium lighting, visitor

bleachers and other track facility improvements at ArmijoHigh School. The construction

budget was approximately $3.3 million.

  

Rodriguez High School 2004 All Weather Running Track, Fairfield, CA: Project

Manager/Construction Manager for the planning, design and construction of a new

rubberized running track and high jump and long jump facilities. Construction budget was

approximately $600,000.

  

Dover Middle School 2004 Modernization, Fairfield, CA: Project Manager/Planner for the

modernization planning, design and construction. The modernization scope included

remodeling restrooms, replacing windows, upgrading flooring and tackible wall surfaces,

replacing the campus fire alarm system other upgrades for conformance with the Americans

with Disabilities Act (ADA). The construction cost was approximately $1.5 million.

  

SemYetoHigh School2004 Modernization, Fairfield, CA: Project Manager/Planner for the

modernization planning, design and construction of a continuation high school. The

modernization scope included a complete renovation of the main building; new interior walls,

HVAC system, new roof and new electrical, fire alarm, data, public address, clock and

telephone systems. The construction cost was approximately $1.3 million.

  

Tolenas and Sheldon Elementary Schools 2004 Modernization, Fairfield, CA: Project

Manager/Planner for the modernization planning, design and construction. The

modernization scope included a significant remodeling of the main building; new roofing,

electrical, fire alarm, Cable TV and data wiring, new restrooms, new windows and other

upgrades for conformance with the Americans with Disabilities Act (ADA). The construction

cost was approximately $1,800,000.

  

Grange Middle School 2003 Modernization, Fairfield, CA: Project Manager/Planner for the

modernization construction. The modernization scope included replacing the entire hydronic

heating and cooling system, remodeling restrooms, upgrading flooring and other upgrades for

conformance with the Americans with Disabilities Act (ADA). The construction cost was

approximately $1.7 million.

  

Sullivan Middle School 2003 Modernization, Fairfield, CA: Project Manager/Planner for the

modernization construction. The modernization scope included replacing the heating and

cooling system in the gymnasium, installating a kitchen ansul suppression system,

remodeling restrooms, upgrading flooring and other upgrades for conformance with the

Americans with Disabilities Act (ADA). The construction cost was approximately $800,000.

  

Anna Kyle Elementary School 2003 Modernization, Fairfield, CA: Project

Manager/Planner for the modernization construction. The modernization scope included

replacing the heating and cooling system in the gymnasium, updating electrical and data

wiring, remodeling restrooms, upgrading flooring and other upgrades for conformance with

the Americans with Disabilities Act (ADA). The construction cost was approximately $1

million.

  

Suisun Valley Elementary School 2003 Modernization, Fairfield, CA: Project

Manager/Planner for the modernization construction. The modernization scope included

remodeling the entry into the main building, remodeling restrooms, updating electrical and

data wiring, upgrading flooring and other upgrades for conformance with the Americans with

Disabilities Act (ADA). The construction cost was approximately $400,000.

  

RodriguezHigh School Science, Video and Theatre Improvements 2007, Fairfield, CA:

Project/Construction Manager for the planning, design and construction of audio and visual

improvements for a video lab and black box theatre and science classroom upgrades.

Construction budget $600,000.

  

RodriguezHigh School Pool and Stadium 2007, Fairfield, CA: Project Manager for the

planning and design of a new pool facility and football stadium including new bleachers,

stadium lights, restroom/concession stand, synthetic turf field and track events. $5,500,000

project budget.

  

Portable Replacement Master Planning 2006, Fairfield, CA: Project Manager for the

master planning at 14 campuses to replace portables with permanent classrooms to make

the portable count no more than 25% of the permanent classroom count, $35,000,0000

estimate.

  

TolenasElementary School Classrooms Replacements 2007, Fairfield, CA: Project

Manager for the planning, design and construction of eight new permanent classrooms,

sitework, new asphalt play area and new restroom. Construction budget $4,000,000.

  

SuisunElementary School Classrooms Replacements 2007, Suisun City, CA: Project

Manager for the planning and design of fourteen new permanent classrooms, sitework, new

asphalt play area and new restroom. Construction budget $4,000,000.