
Tully Consulting is a managed by principal, Robin Tully, PE, a California registered Professional Civil Engineer. Ms. Tully has nine years of engineering experience and has handled projects from planning through to design and construction. Her role in projects has ranged from Project Engineer to Project and Construction Manager. Graduating from Humboldt State University in Arcata, CA with a Bachelor of Science in Environmental Resource Engineering, she is familiar with sustainable site design and water, sewer and stormwater treatment and modeling.
EDUCATION
California State University, Humboldt, Arcata, CA
BS., Environmental Resources Engineering (ABET Accredited)
GPA: 3.67 (last 2 years)
Relevant Coursework: Fluid Dynamics, Water Quality, Open Channel Hydraulics, Hydrology, Soils Analysis and other core Civil Engineering coursework.
COMPUTER SKILLS
CAD Software: AutoCAD/Autodesk, Land Development Desktop
Hydrology Software: HEC-HMS (HEC-1), HEC-RAS (HEC-2), Culvert Master, Flow Master, Storm2000
Additional Software: Microsoft Schedule, Power Point, Access, Excel, Word, Adobe Photoshop
Programming Languages: Fortran 77, Fortran 90
CERTIFICATIONS
Professional Civil Engineer No. C64354, State of California
PROJECT PORTFOLIO
Civil Engineering Experience
FairfieldHigh School Paving Project 2005, Fairfield, CA: Project Engineer for the
preparation of construction documents for an asphalt rehabilitation of the student and staff
parking areas. Construction budget $300,000.
Anna Kyle Elementary Asphalt Extension 2006, Fairfield, CA: Project Engineer for the
preparation of construction documents for a new asphalt play area. Construction budget
$100,000.
Boggs Tract Sanitary Sewer Collection System, San Joaquin County, CA: Project
Engineer for the design of a new sanitary sewer system for the Boggs Tract development in
Stockton. The project involved three miles of 8" sewer pipeline to service 300 homes.
CapertonCanal, Placer County, CA: Project Engineer for the design of a raw water pipe
system through the new Bickford Ranch development. The pipeline will tie into an existing
canal and convey water through two miles of mainline (22" to 36" in diameter) and three
miles of lateral pipeline to provide irrigation water to both existing and new customers.
ColeCreek Dredging, ClearLakeState Park, Town of Kelseyville, CA: Assisted in the
preparation of construction documents for a small dredging project on ClearLake.
Drainage Master Plan, WillRogersState Historic Park, State Department of Parks and
Recreation, City of Los Angeles, CA: Project Engineer for the preparation of a stormwater
management plan for a 187-acre historical park in the Santa Monica mountains. The goals of
the project were to improve runoff water quality, reduce the risk of hillside erosion, and
prevent flooding around the historical structures.
Drainage and Floodplain Study, La Purisima State Historic Park, State Department of
Parks and Recreation, Town of Lompoc, CA: Project Engineer for the preparation of a
stormwater floodplain analysis for a 1,900-acre historical park along the CentralCoast. The
analysis involved preparing a hydrologic and hydraulic model of the local creek and a
preliminary design of a flood detention pond.
Drainage Infrastructure Improvements, FortBakerNational Park, Golden Gate National
Recreation Area, Marin County, CA: Assistant Engineer responsible for providing
construction plans for drainage upgrades within the 350-acre FortBaker historical site. The
work also involved providing the Park staff with recommendations on how to incorporate
sustainable stormwater designs into future Park developments.
Highway 1 Storm Drain Improvements and Noyo Bridge Widening, Fort Bragg, CA:
Assisted in the design of storm drainage for a $9 million Caltrans’ highway rehabilitation and
bridge project.
Highway 101 Storm Drain Improvements, Eureka, CA: Assisted in the design of storm
drain facilities for a $4 million Caltrans’ highway rehabilitation project through a four-mile
section of highway passing through the downtown area of Eureka.
Highway 101 Stabilization Trench and Fill Design, Willits, CA: Aided in the design of
stabilization trenches and a 30’ high polystyrene block fill embankment for a $9 million
Caltrans’ highway realignment along the Ridgewood grade section of Highway 101.
Ocean Colony Lift Station Study, City of Half Moon Bay, CA: Project Engineer for the study
of a 1200 gpm sewer lift station in Half Moon Bay. The goal of the study was to evaluate the
performance of the lift station and make recommendations for it’s proper performance.
Pelican Point Lift Station Rehab, City of Half Moon Bay, CA: Project Engineer for the
rehabilitation of a small sewer lift station for the City of Half Moon Bay. This project involved
the design of a new sewer wet well, new submersible pumps, new electrical controls, and a
new SCADA system.
Phase 2 Trenchless Sewer Rehabilitation, City of Half Moon Bay, CA: Construction
Manager and Project Engineer for the rehabilitation of over 9,500 LF of sewer pipe within the
City of HalfMoonBay. The project involved a competitive bid strategy between several
different trenchless rehab methods including Cured-in-Place Pipe, Fold and Form Pipe,
Pipebursting, Pipereaming, Spiral Wound PVC and and Deformed/Reformed Liner.
Sewer Lift Station, Butte-GlennCommunity College Police Safety Training Grounds, Butte
County, CA: Assisted in the design of a small sanitary sewer lift station for a police training
facility.
Stormwater Consulting, City of Half Moon Bay, CA: Assistant Engineer for the development
of a new stormwater management for the environmentally sensitive City. The work included a
full array of stormwater modeling, NPDES consulting and design services; preparation of a
hydrology model of the entire City, 100-year flood plain models of the two major creeks,
development of a stormwater Capitol Improvement Plan (CIP) for flood control and water
quality protection, drafting of new Design and Improvement Standards for stormwater Best
Management Practices (BMPs), and formulation of a model stormwater monitoring program.
Stormwater Detention System, Town of Mammoth Lakes, CA: Assisted in the preparation
of construction documents for an underground pipe detention system for the Bluffs project.
Stormwater Management Program, Contra Costa County, CA: Assisted in the development
of a stormwater management system for an 175-acre industrial facility. The project involved
designing a runoff management and treatment system to reduce sediment loads getting into
the CarquinezStrait to keep the client in compliance with an NPDES permit from the San
Francisco Regional Water Quality Control Board.
Stormwater Master Plan, Colusa Casino and Rancheria, Colusa, CA: Assisted in the
preparation of a Stormwater Master Plan for a 240-acre Native American Indian reservation.
Created a hydrology model of the contributing watersheds using HEC-HMS and analyzed
alternatives for addressing flood control needs and water quality protection using low impact
site design and stormwater BMP features.
Utilities Master Plan, Folsom Lake State Recreational Area, CA: Assistant Engineer for
recommendations for future utility upgrades within the Folsom State Recreational Area in
response to the State Parks’ new General Plan.
Waterline and Booster Pump Rehab, HawaiiVolcanoesNational Park, National Park
Service, Hawaii: Assistant Engineer for the design of a small water transmission line and
booster pump station in HawaiiVolcanoesNational Park.
2005 Folsom CustodyCenter Relocatables, Folsom, CA for Prison Industry Authority.
Project Engineer for the preparation of construction documents for grading and drainage
plans for the addition of relocatable classrooms to a prison facility.
2005 DeerCreekMaintenanceBuilding, El Dorado Hills, CA for El Dorado Irrigation
District. Project Engineer for the preparation of construction documents for grading and
drainage plans for a new maintenance building with heavy equipment loadings.
2006 D.W. Nelson Youth Correctional FacilityHigh School Modular Classrooms,
Stockton, CA for Prison Industry Authority. Project Engineer for the preparation of
construction documents for grading and drainage plans for new modular classrooms in a
California prison facility.
2006 Preston Youth Correctional FacilityHigh School Modular Classrooms, Ione, CA
for Prison Industry Authority. Project Engineer for the preparation of construction documents
for grading and drainage plans for new modular classrooms in a California prison facility.
2006 Southern Youth Correctional ReceptionCenterHigh School Modular Classrooms,
Norwalk, CA for Prison Industry Authority. Project Engineer for the preparation of
construction documents for grading and drainage plans for modular classrooms in a
California prison facility.
2006 O.H. Close Youth Correctional FacilityHigh School Modular Classrooms,
Stockton, CA for Prison Industry Authority. Project Engineer for the preparation of
construction documents for grading and drainage plans for modular classrooms in a
California prison facility.
2007 Soledad Dairy Inmate Changing Facility, Correctional Training Facility, Soledad, CA
for Prison Industry Authority. Project Engineer for the preparation of construction documents
for grading and drainage plans for modular classrooms in a California prison facility.
2007 New Administrative Office in Folsom, CA for Prison Industry Authority. Project
Engineer for preparation of construction documents for a retaining wall and grading and
drainage for a new administrative office with a focus on green building.
2006 Valhalla YMCA Daycare Facility. Project Engineer for the preparation of construction
documents for grading and drainage plans for the addition of a modular classroom at an
existing elementary school.
2007 Jefferson Commercial Development in West Sacramento, CA. Project Engineer for
the preparation of construction documents for grading, drainage, paving, public street
improvements and water, sewer and fire site utilities for a five acre commercial retail center.
2006 Camino Oruga Warehouses in Napa, CA. Project Engineer for the preparation of
construction documents for grading, drainage, paving and water, sewer and fire site utilities
for three storage warehouses on a three acre light industrial site in Napa, CA.
2007 Corning Light Industrial Shops in Corning, CA. Project Engineer for the preparation
of construction documents for grading, drainage and water and sewer infrastructure for new
light industrial shops on a three acre site.
2007 Rick’s Auto Spa in SuisunCity, CA. Project Engineer for the preparation of
construction documents for grading, drainage, paving and water and sewer utilities for a one
acre site with a recycled water car wash and retail facilty.
2007 Ramtown Karate North Adams Facility in Dixon, CA. Project Engineer for the
preparation of construction documents for grading, drainage and paving for a new karate
studio.
2006 Cogeneration Equipment for Two Healthclubs in San Ramon and Lafayette, CA.
Project Engineer for the preparation of construction documents for grading, drainage and
hardscape improvements for a cogeneration equipment retrofit project.
Project Management Experience
Grange Middle School 2005 Addition and Modernization, Fairfield, CA: Project Manager
for the planning, design and construction of the completion of the campus. New construction
included the addition of an 11,400 sf steel framed gymanisum, a 4 classroom addition, a new
administration building, track, football field, 2 softball fields, and various parking lot and
landscaping rehabilitation. Project budget approximately $8 million.
Sullivan Middle School 2005 Modernization, Fairfield, CA: Project Manager for the
planning, design and construction of a second modernization at the middle school.
Construction budget $750,000.
Fairfield and Armijo High Schools 2005 Stadium Track and Field Improvements,
Fairfield, CA: Project Manager for the planning, design and construction of track and field
improvements in two high school stadiums. The project was to replace the football fields with
synthetic turf fields. The work also involved a new rubberized track, stadium lighting, visitor
bleachers and other track facility improvements at ArmijoHigh School. The construction
budget was approximately $3.3 million.
Rodriguez High School 2004 All Weather Running Track, Fairfield, CA: Project
Manager/Construction Manager for the planning, design and construction of a new
rubberized running track and high jump and long jump facilities. Construction budget was
approximately $600,000.
Dover Middle School 2004 Modernization, Fairfield, CA: Project Manager/Planner for the
modernization planning, design and construction. The modernization scope included
remodeling restrooms, replacing windows, upgrading flooring and tackible wall surfaces,
replacing the campus fire alarm system other upgrades for conformance with the Americans
with Disabilities Act (ADA). The construction cost was approximately $1.5 million.
SemYetoHigh School2004 Modernization, Fairfield, CA: Project Manager/Planner for the
modernization planning, design and construction of a continuation high school. The
modernization scope included a complete renovation of the main building; new interior walls,
HVAC system, new roof and new electrical, fire alarm, data, public address, clock and
telephone systems. The construction cost was approximately $1.3 million.
Tolenas and Sheldon Elementary Schools 2004 Modernization, Fairfield, CA: Project
Manager/Planner for the modernization planning, design and construction. The
modernization scope included a significant remodeling of the main building; new roofing,
electrical, fire alarm, Cable TV and data wiring, new restrooms, new windows and other
upgrades for conformance with the Americans with Disabilities Act (ADA). The construction
cost was approximately $1,800,000.
Grange Middle School 2003 Modernization, Fairfield, CA: Project Manager/Planner for the
modernization construction. The modernization scope included replacing the entire hydronic
heating and cooling system, remodeling restrooms, upgrading flooring and other upgrades for
conformance with the Americans with Disabilities Act (ADA). The construction cost was
approximately $1.7 million.
Sullivan Middle School 2003 Modernization, Fairfield, CA: Project Manager/Planner for the
modernization construction. The modernization scope included replacing the heating and
cooling system in the gymnasium, installating a kitchen ansul suppression system,
remodeling restrooms, upgrading flooring and other upgrades for conformance with the
Americans with Disabilities Act (ADA). The construction cost was approximately $800,000.
Anna Kyle Elementary School 2003 Modernization, Fairfield, CA: Project
Manager/Planner for the modernization construction. The modernization scope included
replacing the heating and cooling system in the gymnasium, updating electrical and data
wiring, remodeling restrooms, upgrading flooring and other upgrades for conformance with
the Americans with Disabilities Act (ADA). The construction cost was approximately $1
million.
Suisun Valley Elementary School 2003 Modernization, Fairfield, CA: Project
Manager/Planner for the modernization construction. The modernization scope included
remodeling the entry into the main building, remodeling restrooms, updating electrical and
data wiring, upgrading flooring and other upgrades for conformance with the Americans with
Disabilities Act (ADA). The construction cost was approximately $400,000.
RodriguezHigh School Science, Video and Theatre Improvements 2007, Fairfield, CA:
Project/Construction Manager for the planning, design and construction of audio and visual
improvements for a video lab and black box theatre and science classroom upgrades.
Construction budget $600,000.
RodriguezHigh School Pool and Stadium 2007, Fairfield, CA: Project Manager for the
planning and design of a new pool facility and football stadium including new bleachers,
stadium lights, restroom/concession stand, synthetic turf field and track events. $5,500,000
project budget.
Portable Replacement Master Planning 2006, Fairfield, CA: Project Manager for the
master planning at 14 campuses to replace portables with permanent classrooms to make
the portable count no more than 25% of the permanent classroom count, $35,000,0000
estimate.
TolenasElementary School Classrooms Replacements 2007, Fairfield, CA: Project
Manager for the planning, design and construction of eight new permanent classrooms,
sitework, new asphalt play area and new restroom. Construction budget $4,000,000.
SuisunElementary School Classrooms Replacements 2007, Suisun City, CA: Project
Manager for the planning and design of fourteen new permanent classrooms, sitework, new
asphalt play area and new restroom. Construction budget $4,000,000.